Dallas development survey guidance

Dallas Plat, Replat, and Survey Guide

How Dallas platting works, when a registered Texas surveyor is needed, and where to start for Dallas development submittals.

Dallas requires subdivision and platting work to move through the City's subdivision process before many residential, commercial, and development permits can proceed. This page gives owners and developers a plain-English starting point for Dallas platting, replats, easements, and survey coordination.

When Dallas Platting Comes Up

Dallas describes platting as the process of subdividing land into legal lots or tracts. The City notes that property must be subdivided before a building permit can be issued for construction of a residential or commercial building.

  • Dividing land into legal lots or tracts
  • Preparing a commercial or residential building permit path
  • Creating or changing easements, alleys, rights-of-way, or lots
  • Cleaning up metes-and-bounds descriptions into lot and block records

Surveyor Requirement

Dallas states that subdivision applications must be submitted to the Subdivision Administrator by a Surveyor registered in the State of Texas. That makes the survey scope, title research, boundary basis, easement review, and plat drawing setup important at the beginning of the job.

  • Confirm whether the site is already platted
  • Review deeds, existing plats, easements, and title commitments
  • Prepare the plat or replat exhibit in the required format
  • Coordinate revisions with City staff before recording

How the Dallas Process Works

Dallas points applicants to its Platting Guidelines, preliminary plat checklist, platting application, and annual plat submittal calendar. The City Plan Commission has a state-law 30-day action window for preliminary plats after application submission.

  • Start with the current Dallas plat submittal calendar
  • Use the Dallas platting guidelines and checklist before filing
  • Expect review for utilities, streets, stormwater, floodplain, trees, and engineering standards
  • Track City Plan Commission timing and staff comments

Dallas Contacts and Next Step

Dallas lists its Subdivision Administrator and subdivision staff contacts on the official Land Development Subdivision page. White Stone can help gather the survey records, prepare the plat package, and coordinate the practical survey questions before the City review starts.

  • Subdivision Administrator: 214-948-4622
  • Dallas Development Services administrative platting contact: 214-948-4344
  • Official Dallas platting page and checklist links are listed below

Official source links

City pages used for this guide

Requirements change. Use these official municipal pages to verify submittal calendars, fees, checklists, and staff contacts before filing.

Get started

Ask White Stone about a Dallas plat or survey

Send the project details through the survey intake or call White Stone directly.